Friday, 28 February 2014
Sunday, 23 February 2014
Friday, 14 February 2014
Wednesday, 12 February 2014
Sunday, 9 February 2014
We created a Facebook page for our production company and for our opening, so far, Sam and I are the only ones who've liked to it I'd say that we'll be in Hollywood at some point in the near future.
https://www.facebook.com/grimproduce
Friday, 7 February 2014
Wednesday, 5 February 2014
Tuesday, 4 February 2014
The re-shooting
We looked through the footage and noticed that the last scene needed to be re-shot. We used my dads room at my house and we neglected to make the misc-en-scene look acceptable for the shot and only used one camera angle, so for this we've decided to make the room look slightly more like a "drug house" and to use more camera angles for us to use to edit in the long run.
Monday, 3 February 2014
Sunday, 2 February 2014
Flatbush Zombies
After looking at the other soundtrack and how it fitted with the footage we shot, we didn't feel that it linked to it, also in the other soundtrack there was someone shouting and that was something we couldn't get rid of, so it was easier to just change the soundtrack as a whole, we decided on this instrumental of a song because it's a more of a chilled out song, and it also it has a lot of bass throughout it and we found it far more fitting for what we wanted to create with our footage we shot.
Saturday, 1 February 2014
Subscribe to:
Posts (Atom)


.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)
.jpg)